Murray Home Sales logo
Floor Plans

Cavco

Clayton

Live Oak

Champion

Palm Harbor Plant City

Timber Creek

Map Your Property
Financing
About
Contact
Privacy Policy & Terms
Floor Plans

Cavco

Clayton

Live Oak

Champion

Palm Harbor Plant City

Timber Creek

Map Your Property
Financing
About
Contact
Privacy Policy & Terms
More
  1. Catalog
The costner interior home features

The costner elevation and exterior home features

The costner elevation and exterior home features

The costner interior home features

The costner interior home features

The costner kitchen home features

The costner kitchen home features

The costner kitchen home features

The costner interior home features

The costner interior home features

The costner bedroom home features

The costner bedroom home features

The costner bathroom home features

The costner bedroom home features

The costner bedroom home features

The costner bedroom home features

The costner bathroom home features

The costner interior home features

The costner elevation and exterior home features

The costner elevation and exterior home features

The costner interior home features

The costner interior home features

The costner kitchen home features

The costner kitchen home features

The costner kitchen home features

The costner interior home features

The costner interior home features

The costner bedroom home features

The costner bedroom home features

The costner bathroom home features

The costner bedroom home features

The costner bedroom home features

The costner bedroom home features

The costner bathroom home features

The costner interior home features

The costner elevation and exterior home features

The costner elevation and exterior home features

The costner interior home features

The costner interior home features

The costner kitchen home features

The costner kitchen home features

The costner kitchen home features

The costner interior home features

The costner interior home features

The costner bedroom home features

The costner bedroom home features

The costner bathroom home features

The costner bedroom home features

The costner bedroom home features

The costner bedroom home features

The costner bathroom home features

The Costner
4 Bed
2 Bath
1,768 Sq. Ft.
28' x 72'

The Costner

Call for price

4 bedrooms

2 full bathrooms

1,768 sq. ft.

28' x 72'

See brochureDesign home
Runner SS Series standard features

Construction

  • 2×4 Marriage Walls
  • 2×6 Floor Joists
  • 3/4″ Tongue & Groove (Nailed & Glued) Floor Decking
  • 3/8″ Rebound Carpet Pad
  • 8′ Flat Ceilings
  • Valances w/Mini Blinds
  • R6 Ducting Throughout
  • 2×4 Marriage Walls
  • 2×6 Floor Joists
  • 3/4″ Tongue & Groove (Nailed & Glued) Floor Decking
  • 3/8″ Rebound Carpet Pad
  • 8′ Flat Ceilings
  • Valances w/Mini Blinds
  • R6 Ducting Throughout

Exterior

  • 2×4 Exterior Walls
Murray Home Sales logo

Murray Home Sales

Privacy Policy & Terms

    Pages

    Murray Home Sales Privacy Policy

    Help

    Contact usTerms of ServicePrivacy PolicyAccessibility

    Get started with Murray Home Sales

    Find, design, and order your next home in a few clicks.

    Sign up

    Dealer License #:

    Powered by BuildTrove.com
    4 Bed
    2 Bath
    1,768 Sq. Ft.
    28' x 72'

    Floor Plan

      The costner floor plan home features

      Property map

      Enter your address or APN/TMS to check if this home fits on your property

      Enter your property street address or APN/TMS


      Virtual Tour



      Exterior & Construction

      • 2×4 Marriage Walls
      • 2×6 Floor Joists
      • 3/4″ Tongue & Groove (Nailed & Glued) Floor Decking
      • 3/8″ Rebound Carpet Pad
      • 8′ Flat Ceilings
      • Valances w/Mini Blinds
      • R6 Ducting Throughout
      • 2×4 Exterior Walls
      • OSB Wrapped End Walls
      • Deluxe Exterior Siding Packages
      • Galvanized Metal Roof (model specific)
      • Sliding Glass Doors
      • Southern-Style Porches
      • Front & Back Door Lighting
      • Exterior Receptacle
      • Shutters on Front & Hitch-End of Home
      • Dormer on all Doublewides 60′ Long & Up
      • 6″ Cement Board Eave Fascia on All Sides
      • Residential Steel Front Door
      • Storm Door
      • 2×4 Marriage Walls
      • 2×6 Floor Joists
      • 3/4″ Tongue & Groove (Nailed & Glued) Floor Decking

      The Costner

      Call for price

      4 bedrooms

      2 full bathrooms

      1,768 sq. ft.

      28' x 72'

      See brochureDesign home
    • OSB Wrapped End Walls
    • Deluxe Exterior Siding Packages
    • Galvanized Metal Roof (model specific)
    • Sliding Glass Doors
    • Southern-Style Porches
    • Front & Back Door Lighting
    • Exterior Receptacle
    • Shutters on Front & Hitch-End of Home
    • Dormer on all Doublewides 60′ Long & Up
    • 6″ Cement Board Eave Fascia on All Sides
    • Residential Steel Front Door
    • Storm Door
      • 2×4 Exterior Walls
      • OSB Wrapped End Walls
      • Deluxe Exterior Siding Packages
      • Galvanized Metal Roof (model specific)
      • Sliding Glass Doors
      • Southern-Style Porches
      • Front & Back Door Lighting
      • Exterior Receptacle
      • Shutters on Front & Hitch-End of Home
      • Dormer on all Doublewides 60′ Long & Up
      • 6″ Cement Board Eave Fascia on All Sides
      • Residential Steel Front Door
      • Storm Door

      Kitchen

      • High-Arch Metal Faucets
      • Oversized Kitchen Farm Sink
      • Wall Ovens and Microwaves
      • Over-the-Range Built-in Microwave
      • Smooth-Top Kitchen Ranges
      • Stainless Steel Range Hood
      • Spacious Granite Island Countertops
      • Real Hardwood Cabinet Doors
      • Chandelier Over Island
      • White-Lined Cabinets
      • Zargen Drawer Systems
      • PEX Plumbing
      • Metal Water Shut Off Valves
      • High-Arch Metal Faucets
      • Oversized Kitchen Farm Sink
      • Wall Ovens and Microwaves
      • Over-the-Range Built-in Microwave
      • Smooth-Top Kitchen Ranges
      • Stainless Steel Range Hood
      • Spacious Granite Island Countertops
      • Real Hardwood Cabinet Doors
      • Chandelier Over Island
      • White-Lined Cabinets
      • Zargen Drawer Systems
      • PEX Plumbing
      • Metal Water Shut Off Valves

      Interior

      • Recessed LED Lighting
      • 2-Panel Arched Interior Doors
      • Atrium Doors
      • Shiplap Accent Walls
      • Dining Room and Kitchen Tray Ceilings
      • Residential Textured Ceilings
      • White-Lined Cabinets
      • Recessed LED Lighting
      • 2-Panel Arched Interior Doors
      • Atrium Doors
      • Shiplap Accent Walls
      • Dining Room and Kitchen Tray Ceilings
      • Residential Textured Ceilings
      • White-Lined Cabinets

      Bathroom

      • Wood-Plank Ceramic Tile
      • Glass Subway Tile Backsplash
      • Stone Step Entry for Garden Tub
      • Customized Cabinetry
      • Porcelain Sinks with Metal Faucets
      • Ceramic Tile Sit-Down Showers
      • Rainforest Shower Head
      • Elongated Toilets
      • White-Lined Cabinets
      • Zargen Drawer Systems
      • PEX Plumbing
      • Metal Water Shut Off Valves
      • 36″ High Vanities in Main Bath
      • Wood-Plank Ceramic Tile
      • Glass Subway Tile Backsplash
      • Stone Step Entry for Garden Tub
      • Customized Cabinetry
      • Porcelain Sinks with Metal Faucets
      • Ceramic Tile Sit-Down Showers
      • Rainforest Shower Head
      • Elongated Toilets
      • White-Lined Cabinets
      • Zargen Drawer Systems
      • PEX Plumbing
      • Metal Water Shut Off Valves
      • 36″ High Vanities in Main Bath

      Mechanical

      • Low-E Insulated Windows
      • Transom Windows
      • R-11 Blown Insulation
      • R-11 Sidewall Insulation
      • R-21 Floor Insulation
      • 40-Gallon Water Heater
      • Smoke Detectors w/Battery Backup
      • 200 Amp Electrical Service
      • Stud-Mounted Switch & Outlet Boxes
      • 12 & 14 Gauge Copper Wiring
      • Rolled I-Beam Frames
      • Low-E Insulated Windows
      • Transom Windows
      • R-11 Blown Insulation
      • R-11 Sidewall Insulation
      • R-21 Floor Insulation
      • 40-Gallon Water Heater
      • Smoke Detectors w/Battery Backup
      • 200 Amp Electrical Service
      • Stud-Mounted Switch & Outlet Boxes
      • 12 & 14 Gauge Copper Wiring
      • Rolled I-Beam Frames
    • Runner SS Series
    • The Costner
    • 3/8″ Rebound Carpet Pad
    • 8′ Flat Ceilings
    • Valances w/Mini Blinds
    • R6 Ducting Throughout
    • 2×4 Exterior Walls
    • OSB Wrapped End Walls
    • Deluxe Exterior Siding Packages
    • Galvanized Metal Roof (model specific)
    • Sliding Glass Doors
    • Southern-Style Porches
    • Front & Back Door Lighting
    • Exterior Receptacle
    • Shutters on Front & Hitch-End of Home
    • Dormer on all Doublewides 60′ Long & Up
    • 6″ Cement Board Eave Fascia on All Sides
    • Residential Steel Front Door
    • Storm Door
    • The costner elevation and exterior home features

      The costner elevation and exterior home features

      Kitchen

      • High-Arch Metal Faucets
      • Oversized Kitchen Farm Sink
      • Wall Ovens and Microwaves
      • Over-the-Range Built-in Microwave
      • Smooth-Top Kitchen Ranges
      • Stainless Steel Range Hood
      • Spacious Granite Island Countertops
      • Real Hardwood Cabinet Doors
      • Chandelier Over Island
      • White-Lined Cabinets
      • Zargen Drawer Systems
      • PEX Plumbing
      • Metal Water Shut Off Valves
      • High-Arch Metal Faucets
      • Oversized Kitchen Farm Sink
      • Wall Ovens and Microwaves
      • Over-the-Range Built-in Microwave
      • Smooth-Top Kitchen Ranges
      • Stainless Steel Range Hood
      • Spacious Granite Island Countertops
      • Real Hardwood Cabinet Doors
      • Chandelier Over Island
      • White-Lined Cabinets
      • Zargen Drawer Systems
      • PEX Plumbing
      • Metal Water Shut Off Valves
      The costner kitchen home features

      The costner kitchen home features

      The costner kitchen home features

      The costner kitchen home features

      The costner kitchen home features

      The costner kitchen home features

      The costner kitchen home features

      The costner kitchen home features

      The costner kitchen home features

      Bathroom

      • Wood-Plank Ceramic Tile
      • Glass Subway Tile Backsplash
      • Stone Step Entry for Garden Tub
      • Customized Cabinetry
      • Porcelain Sinks with Metal Faucets
      • Ceramic Tile Sit-Down Showers
      • Rainforest Shower Head
      • Elongated Toilets
      • White-Lined Cabinets
      • Zargen Drawer Systems
      • PEX Plumbing
      • Metal Water Shut Off Valves
      • 36″ High Vanities in Main Bath
      • Wood-Plank Ceramic Tile
      • Glass Subway Tile Backsplash
      • Stone Step Entry for Garden Tub
      • Customized Cabinetry
      • Porcelain Sinks with Metal Faucets
      • Ceramic Tile Sit-Down Showers
      • Rainforest Shower Head
      • Elongated Toilets
      • White-Lined Cabinets
      • Zargen Drawer Systems
      • PEX Plumbing
      • Metal Water Shut Off Valves
      • 36″ High Vanities in Main Bath
      The costner bathroom home features

      The costner bathroom home features

      Interior

      • Recessed LED Lighting
      • 2-Panel Arched Interior Doors
      • Atrium Doors
      • Shiplap Accent Walls
      • Dining Room and Kitchen Tray Ceilings
      • Residential Textured Ceilings
      • White-Lined Cabinets
      • Recessed LED Lighting
      • 2-Panel Arched Interior Doors
      • Atrium Doors
      • Shiplap Accent Walls
      • Dining Room and Kitchen Tray Ceilings
      • Residential Textured Ceilings
      • White-Lined Cabinets
      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features

      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features

      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner interior home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features

      The costner bedroom home features



      Images of homes are solely for illustrative purposes and should not be relied upon. Images may not accurately represent the actual condition of a home as constructed, and may contain options which are not standard on all homes.

      View similar homes

      Sonic floor plan home features

      Sonic kitchen and hero home features

      Call for price

      Sonic

      4 Bed | 2 Bath | 1,768 Sq. Ft. | 28' x 72'

      View detailsDesign home
      Guardian floor plan home features

      Guardian kitchen and hero home features

      Call for price

      Guardian

      4 Bed | 2 Bath | 1,768 Sq. Ft. | 28' x 72'

      View detailsDesign home
      Spartan floor plan home features

      Spartan floor plan home features

      Call for price

      Spartan

      4 Bed | 2 Bath | 1,976 Sq. Ft. | 28' x 80'

      View detailsDesign home
      The earnhardt floor plan home features

      The earnhardt kitchen and hero home features

      Call for price

      The Earnhardt

      4 Bed | 2 Bath | 1,560 Sq. Ft. | 28' x 64'

      View detailsDesign home